top of page

INSTALLATION PROCESS

IT IS NOT NECESSARY TO HAVE VERY TECHNICAL KNOWLEDGE FOR ASSEMBLY, WITH A BASIC TOOL YOU CAN DO IT YOURSEL

01

MEASUREMENT

With a flexometer we are going to measure the height of the wall or the length of the ceiling where the panels will be installed.

02

COURT

We transfer that measurement to the panel and mark it. We cut the panel with a circular or manual saw according to the marked measurement.

03

CLIP PLACEMENT

Once the piece has been cut to the required length, we place the clips every 60 to 70 cm. along the piece on the exit tab That is, each piece of panel that measures 2.95 meters. requires 3 clips.

04

FIXATION

We place the first piece of panel on the wall, with the clips already inserted. We make sure that the panel is well aligned according to its location on the wall or ceiling.

Using a drill, we will fix the panel to the surface using a stainless steel screw through the central hole of each clip.

We repeat the process with each piece, inserting it into the previously installed piece.

05

ENDING

The last piece to be placed does not have a clip so that everything remains impeccable.

This piece will be glued to the surface with silicone or glue 'no more nails' and the exit tab will be cut, it is very easy!

bottom of page